Steel & Foundry
132kV substation and 33kV distribution for a growing foundry
Utkal Moulders Pvt. Ltd, Rourkela
- Challenge
- The foundry needed a dedicated 132kV intake with 33kV distribution to support melting furnace expansion without compromising statutory approval timelines.
- Solution
- Complete design and engineering of the indoor/outdoor substation, protection philosophy, earthing and 33kV distribution, validated through ETAP load flow, short circuit and relay coordination studies.
- Outcome
- Approval-ready drawings for the electrical inspectorate, optimised equipment ratings and a distribution network scalable for the next furnace bay.
8-10% lower implementation cost through value engineering